Aircraft Onlinee

Selasa, 11 Mei 2010

Match Drilling and Leading Edges

Finished with match drilling the right wing. I assembled the leading edge and attached it as well. The wing is surprisingly wide (or tall since it's on edge). It will be even bigger with the ailerons and flaps installed.

Label: 05-Wings
Posting Lebih Baru Posting Lama Beranda

Arsip Blog

  • ►  2011 (328)
    • ►  November (13)
    • ►  Oktober (55)
    • ►  September (58)
    • ►  Agustus (51)
    • ►  Juli (68)
    • ►  Juni (59)
    • ►  Mei (7)
    • ►  April (4)
    • ►  Maret (2)
    • ►  Februari (7)
    • ►  Januari (4)
  • ▼  2010 (84)
    • ►  Desember (5)
    • ►  November (10)
    • ►  Oktober (4)
    • ►  September (4)
    • ►  Agustus (4)
    • ►  Juli (6)
    • ►  Juni (6)
    • ▼  Mei (9)
      • Fluting Tank Ribs
      • Flight Instructor Ratings CFI, CFII, MEI
      • On to the Fuel Tanks
      • RV-12 Field Trip
      • Built Stall Warning
      • Finished Leading Edges and Tank Attach Strips
      • Crimper & Stripper
      • Match Drilling and Leading Edges
      • More Wing Skins Clecoed
    • ►  April (4)
    • ►  Maret (12)
    • ►  Februari (14)
    • ►  Januari (6)
  • ►  2009 (88)
    • ►  Desember (3)
    • ►  November (1)
    • ►  Oktober (1)
    • ►  Agustus (4)
    • ►  Juli (13)
    • ►  Juni (5)
    • ►  Mei (6)
    • ►  April (11)
    • ►  Maret (15)
    • ►  Februari (12)
    • ►  Januari (17)
  • ►  2008 (10)
    • ►  Desember (10)
  • ►  2006 (11)
    • ►  Juni (1)
    • ►  Maret (1)
    • ►  Februari (8)
    • ►  Januari (1)
  • ►  2005 (8)
    • ►  Desember (1)
    • ►  November (1)
    • ►  September (4)
    • ►  Agustus (2)
Tema Jendela Gambar. Diberdayakan oleh Blogger.